Medlow Bath Upgrade
(Contractor: Abergeldie)
In this phase of the Medlow Bath project, we connected all existing lines to the newly installed sewer system. We decommissioned and removed old sewer infrastructure to make way for the new system. Hydrostatic testing was conducted to ensure that all new connections were secure and leak-free.
Our scope of work included the excavation and installation of a new sewer line. This required connecting new sewer lines to existing infrastructure, ensuring a smooth transition. We conducted leak and pressure testing to confirm compliance and coordinated with utility providers to minimize service disruptions.